Powered by ZigaForm version 4.2

Align Project with Corporate Goals

0%

Establish key performance issues to be addressed: additional capacity, faster cycle times, greater flexibility, better inventory turns, higher productivity, and additional floor space. Ensure that the project goals align with the plant and corporation’s goals.