Powered by ZigaForm version 4.2
STAGE 0: Introduction to the Program
STAGE 1: STANDARDIZE
STAGE 2: TRANSFORM
STAGE 3: REFINE
STAGE 4: ENGINEER
STAGE 5: AWAKEN
STAGE 6: MAINTAIN

10.2 Create Skill List by Workstation [STREAM]

10.2 – Define the skills required for every workstation based on the available information. For every process and workstation in the Mixed Model line, detail and document the skills required.