Powered by ZigaForm version 4.2
STAGE 0: Introduction to the Program
STAGE 1: STANDARDIZE
STAGE 2: TRANSFORM
STAGE 3: REFINE
STAGE 4: ENGINEER
STAGE 5: AWAKEN
STAGE 6: MAINTAIN

10.6 Certify Line Live Operators [STREAM]

10.6 – Observe the target area Operators with the goal of certifying the group that will bring live the Mixed Model line. Supervisors and area leaders support and coach where required, to certify that work is being with quality within Takt time. Record on the Certification Board.