Powered by ZigaForm version 4.2
STAGE 0: Introduction to the Program
STAGE 1: STANDARDIZE
STAGE 2: TRANSFORM
STAGE 3: REFINE
STAGE 4: ENGINEER
STAGE 5: AWAKEN
STAGE 6: MAINTAIN

11.2 Conduct Line Live Assessment [STREAM]

11.1 – Assess the status of the Deployment plan and the Training plan. Verify that the Mixed Model line resources, Operators, and line leadership are ready to bring live the line.