Powered by ZigaForm version 4.2
STAGE 0: Introduction to the Program
STAGE 1: STANDARDIZE
STAGE 2: TRANSFORM
STAGE 3: REFINE
STAGE 4: ENGINEER
STAGE 5: AWAKEN
STAGE 6: MAINTAIN

11.5 Audit All Parts and Materials [STREAM] Copy

11.4 – Verify that all parts and materials are in correct locations and that their replenishment procedures are clear to all staff. Check material presentation at all workstations throughout the Mixed Model Line. Walk and audit the Kanban chains.