Powered by ZigaForm version 4.2
STAGE 0: INTRODUCTION AND ORIENTATION
STAGE 1: LOAD
STAGE 2: INVENTORY
STAGE 3: NAVIGATE
STAGE 4: KEEP
STAGE 5: EXTEND
STAGE 6: DEVELOP

12.10 Set Up Racks and Equipment [LINKED]

12.10 – Set up all the racks and other equipment for the MMMM system. Once the areas have been organized and cleaned, it will be possible to set up any new racking and storage locations. This work should be planned so as to not disrupt the normal workflow excessively.