Powered by ZigaForm version 4.2
STAGE 0: INTRODUCTION AND ORIENTATION
STAGE 1: LOAD
STAGE 2: INVENTORY
STAGE 3: NAVIGATE
STAGE 4: KEEP
STAGE 5: EXTEND
STAGE 6: DEVELOP

12.13 Conduct Full Pull Chain Audit

12.13 – Audit the MMMM system with emphasis on the Material Flow chains (sequences). Once the Kanban system is set up, a full audit will be needed. Use the PFEP database as a checklist, and confirm the setup of every Kanban point and item.