Powered by ZigaForm version 4.2
STAGE 0: Introduction to the Program
STAGE 1: STANDARDIZE
STAGE 2: TRANSFORM
STAGE 3: REFINE
STAGE 4: ENGINEER
STAGE 5: AWAKEN
STAGE 6: MAINTAIN

12.4 Create Audit Task Force [STREAM]

12.3 – Select an Audit Task Force made of internal staff. Include people from outside the line design team. Gather and review all documents, checklists, and other materials used throughout the project.