Powered by ZigaForm version 4.2
STAGE 0: INTRODUCTION AND ORIENTATION
STAGE 1: LOAD
STAGE 2: INVENTORY
STAGE 3: NAVIGATE
STAGE 4: KEEP
STAGE 5: EXTEND
STAGE 6: DEVELOP

12.4 Inventory Available Supplies [LINKED]

12.4 – Assess availability of required supplies to deploy the MMMM system. Although most racking and bins are off-the-shelf items, there will be a supplier lead-time involved in bin and rack procurement, so allow enough time for this in the schedule.