Powered by ZigaForm version 4.2
STAGE 0: INTRODUCTION AND ORIENTATION
STAGE 1: LOAD
STAGE 2: INVENTORY
STAGE 3: NAVIGATE
STAGE 4: KEEP
STAGE 5: EXTEND
STAGE 6: DEVELOP

12.8 Establish a Physical Location for Support Deployment [LINKED]

12.8 – Establish a physical location on the floor, at the center of gravity of the material deployment, with all the necessary equipment to support the deployment.