STAGE 0: INTRODUCTION AND ORIENTATION
STAGE 1: LOAD
STAGE 2: INVENTORY
STAGE 3: NAVIGATE
STAGE 4: KEEP
STAGE 5: EXTEND
STAGE 6: DEVELOP

13.9 Create Pull Chain Audit Process [LINKED]

13.9 – Conduct a Kanban chain audit (pull sequence audit) at least once a month, using the PFEP database information. Check to ensure that the Kanban signaling system is functioning according to its original design, if not, switch to kaizen mode.