Powered by ZigaForm version 4.2
STAGE 0: INTRODUCTION AND ORIENTATION
STAGE 1: LOAD
STAGE 2: INVENTORY
STAGE 3: NAVIGATE
STAGE 4: KEEP
STAGE 5: EXTEND
STAGE 6: DEVELOP

14.2 Define Visual Controls [LINKED]

14.2 – Define the Visual Controls to be deployed so as to communicate the status of the Material Delivery system without the need to ask questions. Brainstorm with the Material Management team the ways which Visual Control tools will be used. These are tools that the Material Management team will use to take action. For example, a visual control tool related to missing Kanban cards can be used to trigger a follow-up audit.