Powered by ZigaForm version 4.2
STAGE 0: INTRODUCTION AND ORIENTATION
STAGE 1: LOAD
STAGE 2: INVENTORY
STAGE 3: NAVIGATE
STAGE 4: KEEP
STAGE 5: EXTEND
STAGE 6: DEVELOP

14.6 Develop and document Standard Work for Materials. [LINKED]

14.6 – Develop and document Standard Work across the Material Management System. Standard Work Definitions should be created to cover the entire workforce, and not just operators. Although the percentage of the day that will be dedicated to doing standard work will vary depending on the management level, Line Leaders, Supervisors and all other members of the Leadership Team should have at least some percentage of their day dedicated to standard work.