Powered by ZigaForm version 4.2
STAGE 0: INTRODUCTION AND ORIENTATION
STAGE 1: LOAD
STAGE 2: INVENTORY
STAGE 3: NAVIGATE
STAGE 4: KEEP
STAGE 5: EXTEND
STAGE 6: DEVELOP

16.2 Assign Leaders for Material Continuous Improvement [LINKED]

16.2 – Select and train Leaders to the Material Continuous Improvement program. Ensure that the entire material team is training in simple problem solving and in the Kaizen method for process improvement. This take the form of a 3-hour training session with hands-on exercises. Schedule regular brainstorming sessions with a focus on the following improvements: Inventory Turnover, free up Working Capital, free up Floor Space, eliminate Stock-outs, achieve Quick Material Changeovers.