Powered by ZigaForm version 4.2
STAGE 0: INTRODUCTION AND ORIENTATION
STAGE 1: LOAD
STAGE 2: INVENTORY
STAGE 3: NAVIGATE
STAGE 4: KEEP
STAGE 5: EXTEND
STAGE 6: DEVELOP

4.4 Assign Material Flow Codes to Parts [LINKED]

4.4 – Assign a Material Flow chain to every part to perform initial calculations. This is a manual step, but it can be accelerated by assigning by ABC code or commodity code.