Powered by ZigaForm version 4.2
STAGE 0: Introduction to the Program
STAGE 1: STANDARDIZE
STAGE 2: TRANSFORM
STAGE 3: REFINE
STAGE 4: ENGINEER
STAGE 5: AWAKEN
STAGE 6: MAINTAIN

4.3 Add Standard Times [STREAM] Copy

Replace every “X” in the Process Flow Matrix with time data from Standard Work Definitions. Separate columns for labor and machine times for every process when appropriate. Add rows and formulas to calculate the weighted average of the Standard Times per process for every resource – labor and machine.