Powered by ZigaForm version 4.2
STAGE 0: Introduction to the Program
STAGE 1: STANDARDIZE
STAGE 2: TRANSFORM
STAGE 3: REFINE
STAGE 4: ENGINEER
STAGE 5: AWAKEN
STAGE 6: MAINTAIN

6.9 Develop Initial Sequencing Rules [STREAM] Copy

5.12 – Develop the sequencing rules based on your design specific characteristics. Define if the Planner will sequence by work content, paint color, packaging needs, customer orders, shipping location, etc. Sequencing smooths the line’s flow, helps avoid jamming and starving workstations.